Network Installation Sign-Off & Commissioning Reports

NetworkQC produces the commissioning documentation and sign-off reports that structured cabling installations require at handover. Document every port tested, every panel certified, and generate a PDF the client can sign before you leave the site.

What the NetworkQC commissioning report includes

Job & location details
Project name, site location, and date of testing clearly identified on every report
Panel label & port count
Each patch panel identified by its label with the total port count tested
Pass/fail summary counts
Total ports tested, number passed, number failed — clear overview at a glance
Full port-by-port breakdown
Every port listed with its individual pass/fail result — the audit trail clients expect

The commissioning sign-off workflow

1

Set up the job

Create a job for the project with the site name and location. Add locations for each comms room or IDF that has patch panels.

2

Register each panel

Add each patch panel with its label (e.g. "PP-01") and port count. The system creates every port record automatically.

3

Walk the panels

From any phone or tablet, tap each port to record pass or fail during testing. Progress saves instantly — no risk of losing work.

4

Review and confirm

The visual grid shows your complete panel state. Bulk-pass clean panels or address individual port failures before closing out.

5

Download the sign-off PDF

Generate the commissioning report as a PDF. Share it with the client at handover or file it with the project documentation.